FAQ |
Calendar |
![]() |
|
Lounge Berita atau artikel yang unik, aneh, dan menambah wawasan semuanya ada disini dan bisa dishare disini. |
![]() |
|
Thread Tools |
#1
|
||||
|
||||
![]()
gan, ada yang bisa jawab ini ga ? plis serius kaga bercanda ni.. jangan komeng yang ga pentingg.. Arthur Meiners is the production manager of Wheel-Rite, a small producer of metal pafts. Wheel-Rite supplies Cal-Tex, a larger assembly company, with 10,000 wheel bearings each year. This order has been stable for some time. Setup cost for Wheel-Rite is S40, and holding cost is $.60 per wheel bearing per year. Wheel-Rite can produce 500 wheel bearings per day. Cal-Tex is a just-in{ime manufacturer and requires that 50 bearings be shipped to it each business day. a) What is the optimum production quantity? b) What is the maximum number of wheel bearings that will be in inventory at Wheel-Rite? c) How many production runs of wheel bearings will Wheel-Rite have in a year'? d) What is the totai setup + holding cost for Wheel-Rite? Terkait:
|
![]() |
|
|